Other 3G Projects
Details
Hangar 17
Paint Spray Facility, Cambridge
- Construction of a specialist aircraft paint spray facility within an existing hangar
- Quasi two-stage negotiated contract with specialist contractor
Hangar 16
Cambridge
- Refurbishment of another hangar within a live airport environment
- Focused on delivering best value for the Client and providing a facility with a limited lifespan
BAe Systems
Barrow-in-Furness
- Provision of ad-hoc specialist NEC contract advice to a sub-contractor on a large new build project for British Aerospace.
- Role expanded to cover post-contract agreement of Compensation Events.
Ampthill Town Football Club and Town Council
Ampthill Park (Works undertaken as sub-consultant to Martyn Leeks Limited)
- Remodelling and extensions to existing football club to form a combined facility for Ampthill Town Council and Ampthill Town Football Club
Silver Street Cambridge
Public Toilet Facilities
- The refurbishment of the below ground public toilet facilities located in a busy city centre location
Lauterpacht Centre
Cambridge
- Internal re-configuration and refurbishment of existing toilets
- Construction of glazed link corridor between two separate buildings
Church of St Etheldreda
Reach Re-ordering
- Proposed refurbishment and improvement works to the existing Garde II Church providing improved heating and thermal insulation, including a completely new floor structure, and reconfigured internal spaces
- Remedial works undertaken to the ruined east end wall of a mediaeval church located within the grounds
New Gym Unit
Cambridge Retail park (services provided as a sub-consultant to Gardiner & Theobald)
- A new shell and core building for later Tenant fit out for a new two-storey gym building
- A separate enabling works contract removes two buried concrete ground slabs prior to commencement of the main works contract
Courtauld Galleries
Fitzwilliam Museum (services provided as a sub-consultant to Gardiner & Theobald)
- The initial phase of the refurbishment and improvements to the environmental conditions and building fabric to galleries within the Grade I listed Museum
- Stringent security and access requirements to both the Contractor’s compound and the works areas within the Museum and limitations on the Contractor’s working hours
St Johns
Divinity School (work undertaken whilst at Gardiner & Theobald)
- Sympathetic redevelopment of an existing Grade II listed building to create offices, supervision spaces, lecture theatre, exhibition/congregation area and storage
- Significant archaeological investigations on site of an historic graveyard
New Academic Building
University of East Anglia (work undertaken whilst at Gardiner & Theobald)
- Four storey academic building utilising the unusual combination of cross laminated timber panels and Termodeck floor slabs
- Two-stage design and build procurement
Building B300
Gt Chesterford Business Park (work undertaken whilst at Gardiner & Theobald)
- Fit out of a shell and core building to provide a new Pharmaceutical process development suite
- JCT Constructing Excellence Contract with bespoke amendments for Construction Management and a pain/gain mechanism for the Construction Manager and Trade Contractors
Project Accordia
Cambridge (work undertaken whilst at Gardiner & Theobald)
- Multi-phase residential development on a brownfield site in central Cambridge
- 264 private dwellings and 114 affordable units
- Phase 1 won the Stirling Prize in 2008